Hit-products LogicPLUS S 42/128 Manual de usuario Pagina 18

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 45
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 17
LogicPLUS-S Two-Wire Controller
18
18
Position 6 | | Calendar | | Function Button Odd-Even






: May be accessed by pressing Function Key Set 5.





 This is the day of the calendar that the program will start. This will be automatically set upon
initial programming or set by the user. This is day 1 of the calendar, the day you set up the calendar
or programmed the program or let the auto-calendar set up the calendar.
 The total run time of the program has carried over into the second or more days and the
program will be running these days to complete.
 The user has programmed in additional days that the program will not be active.



For calculating the calendar for “Run” Times over 24 hours. This example is for 56 hours Run Time
per Program.
 If a start time is 8:00 am, then the rst calculation would be 8 hours plus a total run time
of 56 hours for a grand total of 64 hours, divided by 24 hours would equal a 2.67 day calendar, the
display would show a 3 day calendar, as follows, day 1 STRT, day 2 RUN and day 3 RUN. If you
wanted to irrigate every 4th day, use set 2 to expand the calendar from 3 days to 4 days, day 4
would show OFF.




Vista de pagina 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 44 45

Comentarios a estos manuales

Sin comentarios